Michell Instruments needed to install a new, larger compressor, so we replaced the old three-phase distribution board in the compressor room with a new one.
The new board was specially made by Proteus and incorporates both MCB and MCCB protection.

Replacing a compressor room distribution board so a larger compressor could be installed.

Michell Instruments needed to install a new, larger compressor, so we replaced the old three-phase distribution board in the compressor room with a new one.
The new board was specially made by Proteus and incorporates both MCB and MCCB protection.

Replacing every old fluorescent light in the gym with bright LED strip lighting.
LED lighting, emergency lighting, heaters, and power and data for a company’s new office in Ely.
Five fans that push warm air back down to the factory floor, part funded by an energy-saving grant.
Send us a few details and we’ll get back to you to talk it through, arrange to see the job if it needs it, and send you a detailed quote, so there are no nasty surprises.
Prefer to talk? Call 01223 430 430 or email enquiries@cambridge-electrical.co.uk